2692 鋼管自動下料機
2692 鋼管自動下料機,鋼管,自動,下料機
河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 0英文原文Latest Developments in Belt Conveyor TechnologyM. A. AlspaughOverland Conveyor Co., Inc.Presented at MINExpo 2004Las Vegas, NV, USASeptember 27, 2004AbstractBulk material transportation requirements have continued to press the belt conveyor industry to carry higher tonnages over longer distances and more diverse routes. In order keep up, significant technology advances have been required in the field of system design, analysis and numerical simulation. Examples of complex conveying applications along with the numerical tools required to insure reliability and availability will be reviewed.IntroductionAlthough the title of this presentation indicates “new” developments in belt conveyor technology will be presented, most of the ideas and methods offered here have been around for some time. We doubt any single piece of equipment or idea presented will be “new” to many of you. What is “new” are the significant and complex systems being built with mostly mature components ,what is also “new” is the increasing ability to produce accurate computer simulations of system performance prior to the first system test (commissioning).As such, the main focus of this presentation will be the latest developments in complex system design essential to properly engineer and optimize today’s long distance conveyance requirements. The four specific topics covered will be:? Energy Efficiency? Route Optimization? Distributed Power? Analysis and Simulation 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 1Energy EfficiencyMinimizing overall power consumption is a critical aspect of any project and belt conveyors are no different. Although belt conveyors have always been an efficient means of transporting large tonnages as compared to other transport methods, there are still various methods to reduce power requirements on overland conveyors. The main resistances of a belt conveyor are made up of:? Idler Resistance? Rubber indentation due to idler support? Material/Belt flexure due to sag being idlers? AlignmentThese resistances plus miscellaneous secondary resistances and forces to over come gravity (lift) make up the required power to move the material.In a typical in-plant conveyor of 400m length, power might be broken into its components as per Figure 1 with lift making up the largest single component but all friction forces making up the majority.In a high incline conveyor such as an underground mine slope belt, power might be broken down as per Figure 2, with lift contributing a huge majority. Since there is no way to reduce gravity forces, there are no means to significantly 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 2reduce power on high incline belts.But in a long overland conveyor, power components will look much more like Figure 3, with frictional components making up almost all the power. In this case, attention to the main resistances is essential.The specifics of power calculation is beyond the scope of this paper but it is 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 3important to note that significant research has been done on all four areas of idlers, rubber indentation, alignment and material/belt flexure over the last few years. And although not everyone is in agreement as to how to handle each specific area, it is generally well accepted that attention to these main resistances is necessary and important to overall project economics.At the 2004 SME annual meeting, Walter Kung of MAN Takraf presented a paper titled “The Henderson Coarse Ore Conveying System- A Review of Commissioning, Start-up and Operation”2. This project was commissioned in December 1999 and consisted of a 24 km (3 flight) overland conveying system to replace the underground mine to mill rail haulage system.The longest conveyor in this system (PC2) was 16.28 km in length with 475m of lift. The most important system fact was that 50% of the operating power (~4000 kW at 1783 mt/h and 4.6 m/s) was required to turn an empty belt therefore power efficiency was critical. Very close attention was focused on the idlers, belt cover rubber and alignment. One way to document relative differences 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 4in efficiency is to use the DIN 22101 standard definition of “equivalent friction factor- f” as a way to compare the total of the main resistances. In the past, a typical DIN fused for design of a conveyor like this might be around 0.016. MAN Takraf was estimating their attention to power would allow them to realize an f of 0.011, a reduction of over 30%. This reduction contributed a significant saving in capital cost of the equipment. The actual measured results over 6 operating shifts after commissioning showed the value to be 0.0075, or even 30% lower than expected. Mr. Kung stated this reduction from expected to result in an additional US$100, 000 savings per year in electricity costs alone.Route OptimizationHorizontal AdaptabilityOf course the most efficient way to transport material from one point to the next is as directly as possible. But as we continue to transport longer distances by conveyor, the possibility of conveying in a straight line is less and less likely as many natural and man-made obstacles exist. The first horizontally curved conveyors were installed many years ago, but today it seems just about every overland conveyor being installed has at least one horizontal change in direction. And today’s technology allows designers to accommodate these curves relatively easily.Figures 5 and 6 shows an overland conveyor transporting coal from the 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 5stockpile to the ship loader at the Tianjin China Port Authority installed this year. Designed by E.J.O’Donovan & Associates and built by Continental Conveyor Ltd of Australia, this 9 km overland carries 6000 mtph with 4x1500 kW drives installed.The Wyodak Mine, located in the Powder River Basin of Wyoming, USA, is the oldest continuously operating coal mine in the US having recorded annual production since 1923. It currently utilizes an overland (Figure 7) from the new pit to the plant 756m long (2,482 ft) with a 700m (2,300 ft) horizontal radius. This proves a conveyor does not need to be extremely long to benefit from a 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 6horizontal turn.TunnelingAnother industry that would not be able to use belt conveyors without the ability to negotiate horizontal curves is construction tunneling. Tunnels are being bore around the world for infrastructure such as waste water and transportation. The most efficient method of removing tunnel muck is by connecting an advancing conveyor to the tail of the tunnel boring machine. But these tunnels are seldom if ever straight. One example in Spain is the development of a 10.9m diameter tunnel under Barcelona as part of the Metro (Train) Extension Project. Continental Conveyor Ltd. installed the first 4.7km conveyor as shown in Figures 8 and 9 and has recently received the contract to install the second 8.39 km conveyor.In another example, Frontier Kemper Construction is currently starting to bore 6.18 km (20,275 ft) of 3.6m (12 foot) diameter tunnel for the Metropolitan St. Louis (Missouri) Sewer District. The Baumgartner tunnel (Figure 10) will be equipped with a 6.1 km conveyor of 600mm wide belting with 4 intermediate drives. 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 7Pipe ConveyorsAnd if conventional conveyors cannot negotiate the required radii, other variations of belt conveyor such as the Pipe Conveyor might be used.In its simplest description, a pipe conveyor consists of a rubber conveyor belt rolled into a pipe shape with idler rolls. This fundamental design causes the transported material to be totaled enclosed by the belt which directly creates all the advantages. The idlers constrain the belt on all sides allowing much tighter curves to be negotiated in any direction. The curves can be horizontal, vertical or combinations of both. A conventional conveyor has only gravity and friction between the belt and idlers to keep it within the conveyance path. Another benefit of pipe conveyor is dust and/or spillage can be reduced because the material is completely enclosed. A classic example where both environment and adaptability to path were particularly applicable was at the 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 8Skyline Mine in UT, USA (Figure 12). This 3.38 km (11,088 ft) Pipe Conveyor was installed by Thyssen Krupp Robins through a national forest and traversed 22horizontal and 45 vertical curves.Metso Rope ConveyorAnother variation from conventional is the Metso Rope Conveyor (MRC) more commonly known as Cable Belt. This product is known for long distance conveying and it claims the longest single flight conveyor in the world at Worsley Alumina in Australia at 30.4 km. With Cable Belt, the driving tensions (ropes) and the carrying medium (belt) are separated (Figure 13).Figure 15 shows a 10.4 km Cable Belt with a 430m horizontal radius at Line 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 9Creek in Canada.Vertical AdaptabilitySometimes material needs to be raised or lowered and the conventional conveyor is limited to incline angles around 16-18 degrees. But again non-traditional variations of belt conveyors have been quite successful at increased angles as well as straight up.High Angle Conveyor (HAC)The first example manufactured by Continental Conveyor & Equipment Co. uses conventional conveyor components in a non-conventional way (Figure 16). The concept is known as a sandwich conveyor as the material is carried between two belts.Continental’s 100th installation of the HAC? was a unique shiftable installation at Mexican de Canenea’s heap leach pad (Figure 17). 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 10PocketliftThe second example shows a non-traditional belt construction which can be used to convey vertically (Figure 18).This Metso Pocketlift belt was installed by Frontier Kemper Constructors at the Pattiki 2 Mine of White County Coal in 2001 (Figure 19). It currently lifts 1,818 mtph of run-of-mine coal up 273 m (895 ft). Distributed PowerOne of the most interesting developments in technology in the recent past has been the distribution of power along the conveyor path. It has not been uncommon to see drives positioned at the head and tail ends of long conveyors and let the tail drive do the work of pulling the belt back along the return run of the conveyor. But now that idea has expanded to allow designers to position drive power wherever it is most needed. The idea of distributing power in multiple locations on a belt conveyor has been around for a long time. The first application in the USA was installed at Kaiser Coal in 1974. It was shortly thereafter that underground coal mining began consolidating and longwall mines began to realize tremendous growth in output. Mining equipment 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 11efficiencies and capabilities were improving dramatically. Miners were looking for ways to increase the size of mining blocks in order to decrease the percentage of idle time needed to move the large mining equipment from block to block. Face widths and panel lengths were increasing. When panel lengths were increased, conveyance concerns began to appear. The power and belt strengths needed for these lengths approaching 4 -5 km were much larger than had ever been used underground before. Problems included the large size of high power drives not to mention being able to handle and move them around. And, although belting technology could handle the increased strength requirements, it meant moving to steel reinforced belting that was much heavier and harder to handle and more importantly, required vulcanized splicing. Since longwall panel conveyors are constantly advancing and retreating (getting longer and shorter), miners are always adding or removing rolls of belting from the system. Now the need surpassed the risk and the application of intermediate drives to limit belt tensions and allow the use of fabric belting on long center applications was actively pursued.Today, intermediate drive technology is very well accepted and widely used in underground coal mining. Many mines around the world have incorporated it into their current and future mine plans to increase the efficiency of their overall mining operations. The tension diagram in Figure 20 shows the simple principal and most significant benefit of intermediate belt conveyor drives. This flat, head driven conveyor has a simple belt tension distribution as shown in black. Although the average belt tension during each cycle is only about 40% of the peak value, all the belting must be sized for the maximum. The large drop in the black line at the head pulley represents the total torque or power required to run the conveyor. 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 12By splitting the power into two locations (red line), the maximum belt tension is reduced by almost 40% while the total power requirement remains virtually the same. A much smaller belt can be used and smaller individual power units can be used. To extend the example further, a second intermediate drive is added (green line) and the peak belt tension drops further. The tunneling industry was also quick to adopt this technology and even take it to higher levels of complexity and sophistication. But the main need in tunneling was the necessity of using very tight horizontal curves.By applying intermediate drives (Figure 21) to an application such as the Baumgartner Tunnel as described in Figure 10 above, belt tensions can be controlled in the horizontal curves by strategically placing drives in critical 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 13locations thereby allowing the belt to turn small curves.In Figure 22, the hatched areas in green represent the location of curved structure. The blue line represents carry side belt tensions and the pink line represents return side belt tensions. Notice belt tensions in both the carry and return sides are minimized in the curves, particularly the tightest 750m radius.Although aboveground overland conveyors have not used this technology extensively to date, applications are now starting to be developed due to horizontal curve requirements. Figure 23 shows a South American, 8.5km hard rock application which requires an intermediate drive to accommodate the four relatively tight 2000m radii from the midpoint to discharge.Figure 24 shows a comparison of belt tensions in the curved areas with and without distributed power. 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 14The benefit of distributed power is also being used on the MRC Cable Belt. However, since the tension carrying ropes are separate from the load carrying belt, installing intermediate drives is even easier as the material never has to leave the carry belt surface. The tension carrying ropes are separated from the belt long enough to wrap around drive sheaves and the carry belt is set back on the ropes to continue on (Figure 25).Analysis and SimulationMany will argue the major reason for our ability to build complex conveyors as described above is advancements in the analysis and simulation tools available to the designer. A component manufacturer can usually test his product to insure it meets the specification; however the system engineer can seldom test the finished system until it is completed on site. Therefore computational methods and tools are absolutely critical to simulate the interactions of various diverse disciplines and components. Dynamic Starting and StoppingWhen performing starting and stopping calculations per CEMA or DIN 22101 (static analysis), it is assumed all masses are accelerated at the same time and rate; in other words the belt is a rigid body (non-elastic). In reality, drive torque transmitted to the belt via the drive pulley creates a stress wave which starts the belt moving gradually as the wave propagates along the belt. Stress 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 15variations along the belt (and therefore elastic stretch of the belt) are caused by these longitudinal waves dampened by resistances to motion as described above.Many publications since 1959 have documented that neglecting belt elasticity in high capacity and/or long length conveyors during stopping and starting can lead to incorrect selection of the belting, drives, take-up, etc. Failure to include transient response to elasticity can result in inaccurate prediction of:? Maximum belt stresses? Maximum forces on pulleys? Minimum belt stresses and material spillage? Take-up force requirements? Take-up travel and speed requirements? Drive slip? Breakaway torque? Holdback torque? Load sharing between multiple drives? Material stability on an inclineIt is, therefore, important a mathematical model of the belt conveyor that takes belt elasticity into account during stopping and starting be considered in these critical, long applications. A model of the complete conveyor system can be achieved by dividing the conveyor into a series of finite elements. Each element has a mass and rheological spring as illustrated in Figure 26. Many methods of analyzing a belt’s physical behavior as a rheological spring have been studied and various techniques have been used. An appropriate model needs to address:1. Elastic modulus of the belt longitudinal tensile member2. Resistances to motion which are velocity dependent (i.e. idlers)3. Viscoelastic losses due to rubber-idler indentation4. Apparent belt modulus changes due to belt sag between idlers 河南理工大學(xué)萬方科技學(xué)院本科畢業(yè)論文 16unloading. The transfer chute is often sited as the highest maintenance area of the conveyor and many significant production risks are centered here.Since the mathematics necessary to solve these dynamic problems are very complex, it is not the goal of this presentation to detail the theoretical basis of dynamic analysis. Rather, the purpose is to stress that as belt lengths increase and as horizontal curves and distributed power becomes more common, the importance of dynamic analysis taking belt elasticity into account is vital to properly develop control algorithms during both stopping and starting.Using the 8.5 km conveyor in Figure 23 as an example, two simulations of starting were performed to compare control algorithms. With a 2x1000 kW drive installed at the head end, a 2x1000 kW drive at a midpoint carry side location and a 1x1000kW drive at the tail, extreme care must be taken to insure proper coordination of all drives is maintained.Figure 27 illustrates a 90 second start with very poor coordination and severe oscillations in torque with corresponding oscillations in velocity and belt tensions. The T1/T2 slip ratio indicates drive slip could occur. Figure 28 shows the corresponding charts from a relatively good 180 second start coordinated to safely and smoothly accelerate the conveyor.Mass Flow at Transfer PointsOne of the reasons for using intermediate drives and running single flight conveyors longer and longer is to eliminate transfer points. Many of the most difficult problems associated with belt conveyors center around loading and? Plugging? Belt and Chute Damage and Ab
收藏