湖南省冷水江市塘沖礦45萬噸新井設(shè)計【含CAD圖紙+文檔】
湖南省冷水江市塘沖礦45萬噸新井設(shè)計【含CAD圖紙+文檔】,含CAD圖紙+文檔,湖南省,冷水江市,塘沖礦,45,萬噸新井,設(shè)計,cad,圖紙,文檔
摘 要
本設(shè)計是針對湘煤集團唐沖煤礦所做的礦井初步設(shè)計。唐沖煤礦自然地質(zhì)條件中等,可采煤層三號煤平均厚2.76m,傾角一般為10°~25°左右。礦井正常涌水量為118m3/h,最大涌水量為179 m3/h。礦井絕對瓦斯涌出量為10.78 m3/min,相對瓦斯涌出量為11.35 m3/t,預測為高瓦斯礦井。煤塵具有爆炸危險性,煤層沒有自燃發(fā)火傾向。井田東西長1.8~2.1km,南北寬約為4.5km,面積約10km2,設(shè)計井田的可采儲量為3032萬t,設(shè)計年產(chǎn)量為0.45Mt,服務年限為51a。
本設(shè)計礦井采用斜井兩水平水開拓,采區(qū)式準備方式,采區(qū)內(nèi)采用走向長壁采煤法,全部垮落法管理頂板,礦井前期采用對角式通風。主要對礦井開拓方式、準備方式、采煤方法進行了初步設(shè)計,對礦井運輸、通風、排水等生產(chǎn)系統(tǒng)進行了設(shè)備選型計算,對礦井各個生產(chǎn)系統(tǒng)的生產(chǎn)過程進行了描述,并對礦井各個生產(chǎn)系統(tǒng)和各生產(chǎn)環(huán)節(jié)之間的相互聯(lián)系和制約關(guān)系進行了有關(guān)說明。
關(guān)鍵詞: 立井 塘沖煤礦 高瓦斯 走向長壁采煤法
Abstract
This preliminary design is designed for Tang Chong mine of in HuNan province. The natural geological condition is medium, the mining seam :the average thickness is 2.76m,.Generally,the dip is 10°~25°.Normally,the water-holding capacity is118 m3/h,the largest water-holding capacity is 179 m3/h.The gas’s absolute emission is 10.78m3/min,the gas’s contrast emission is 11.35m3/t. This is very dangerous, this mine is prophecied as high prominent gas. The coal-dust has explosion hazard, the seam doesn’t have spontaneous combustion tendency. The spontaneous combustion is appraised for three kinds. The field is4.5km long along the east-west direction and is .8~2.1km width along the south-north direction. The area is 9 square .The designed field’s mining is 3032million ton. The designed annual is 0.45Mt, and it will serve for 51a.
This mine uses two level to climb the mountain .It’s ways to prepare is using the area of the mine .In the area of the mine, the method of mining is using walking toward the long wall .The method of manage the roof is using collapse. In the front period of the mine uses the central paratactic type to ventilate. This preliminary design is mainly for the Pioneering way , prepare types, mining types. This design also chooses the model of the transportation system, ventilation system, drainage systemact. And, it also describes the production process of every system in the mine. This design explain the relationship and restrict relationship between every production system and every production links.
Key words: Vertical Shaft,Tong Chong mine,high gas,two level climb the mountain, the walking toward long wall mining
1
收藏
編號:1737281
類型:共享資源
大?。?span id="kywiwiy4em" class="font-tahoma">1.56MB
格式:ZIP
上傳時間:2019-11-04
50
積分
- 關(guān) 鍵 詞:
-
含CAD圖紙+文檔
湖南省
冷水江市
塘沖礦
45
萬噸新井
設(shè)計
cad
圖紙
文檔
- 資源描述:
-
湖南省冷水江市塘沖礦45萬噸新井設(shè)計【含CAD圖紙+文檔】,含CAD圖紙+文檔,湖南省,冷水江市,塘沖礦,45,萬噸新井,設(shè)計,cad,圖紙,文檔
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學習交流,未經(jīng)上傳用戶書面授權(quán),請勿作他用。